MICHELLE MARIN
item
MICHELLE MARIN
item
Home
About
Contact
Portfolio
Commissions
Artist Statement & CV
Store
Home
About
Contact
Portfolio
Commissions
Artist Statement & CV
Store

Artist Statement

Through my work, I honour the people in my life. My subjects are my community members, often living and working in healthcare settings. Sometimes I make their portraits, and sometimes I use still-life and landscape compositions as a stand-in for a person or a group of people whose challenging stories weigh heavily on my mind. In all works, I explore who and what make a home. 

After studying material arts, with a focus on fibre, at the Ontario College of Art and Design University (OCAD U) in Toronto, Canada in 2016, I went back to school to complete a diploma in Gerontology at George Brown College (GBC). At OCAD U, I received the technical training I needed to become a craftsperson and artist. At GBC, I found my subject matter. Though these fields may seem disconnected, it is the synergy of the two that has given voice to my art. 

My artistic inspiration is primarily drawn from the observations I have made as a healthcare worker in the long-term care home sector. The blossoming and decaying floral bouquets in my still-life compositions speak to the fragility of life, so evident in palliative and end of life care. Domestic objects such as cups, vases and books reference the idea of a home. For so many residents living in long term care homes, their home is not the clinical setting in which they reside, but rather found in the small personal items they are able to keep that represent their individuality. For healthcare workers and residents, both living and working in the same space, bonds are formed over quiet moments in which favourite items are discussed, common interests are discovered and/or a warm beverage is shared. 

I explore contemporary mark making through traditional craft and art techniques. I hand sew, needle felt and paint with yarn, wool roving, polymer clay, watercolour paint, acrylic paint and pencil crayon on linen canvas. Working with a variety of mixed media on the same surface presents technical challenges that parallel the emotional challenges I have faced as a healthcare worker. When visual harmony and an internal catharsis are experienced, the individual work is complete and ready to be shared.

CV

EDUCATION

2019 - Diploma (Gerontology), George Brown College, Toronto, ON

2016 - Bachelor of Design (Material Art & Design: Fibre), OCAD University, Toronto, ON

REPRESENTATION

2022 - Spence Gallery, Toronto

2021 - 22 - helloart, Toronto

EXHIBITION WORK

2023 - (upcoming April 2024) Two person show at Spence Gallery, curated by Joan Spence, Toronto, ON 

2023 - Affordable Art Fair NY with Spence Gallery, curated by Joan Spence, New York

2022 - Solo show with helloart at The Tampered Press, curated by Susan El-Rass, Toronto, ON                                                                             

2022 - Affordable Art Fair UK with Spence Gallery, curated by Joan Spence, London, UK                                                                                    

2021 - Riverdale Artwalk. Artists' Network, Online Exhibition 

2021 - TOAF60 in Virtual Reality. Curated by Daniel St-Amant. Hashtag Gallery, Virtual Reality Exhibition with ArtGate VR

2021 - 2D Works. Toronto Outdoor Art Fair, Online Exhibition 

2021 - New Member's Exhibition. Colour and Form Society, Online Exhibition

2021 - Bubbled. The Artists Project, Online Exhibition 

2021 - Portraits of Resilience. The Art Gallery of Ontario, Online Exhibition 

2021 - CFS Members 2 Foot Square Exhibition. Steve Wilson Studios & The Gallery, Niagra Falls, Canada

2021 - heART of healthCARE. Curated by Tyler Sherard. Patients for Patient Safety Canada, Virtual Exhibition with Kunstmatrix

2020 - Big Holiday Smalls Show. Leslie Grove Gallery, Online Exhibition 

2020 - 68th Annual Open Juried Online Exhibition. Colour and Form Society, Online Exhibition

2020 - Woven Stories. Curated by Angela McIntosh, Online Exhibition

2020 - Coming Home - An Online Art Exhibition. Curated by Phil Anderson and Mariah Lamont, Gallery 1313, Online Exhibition 

2020 - Botanicals. Light Space and Time Online Art Gallery, Online Exhibition 

TEACHING EXPERIENCE

2021 - “Watercolour for Beginners”. The New Brunswick College of Craft & Design, Online. Workshop.

2019 - 20 - “Watercolour Painting”. Rekai Centres, Toronto, ON. Workshops.2019 - "KND462 Knitwear Design". School of Fashion Arts at Seneca College, Toronto, ON. Lecture and Studio Lab. 

2019 - “Sock Knitting”. Romni Wools, Toronto, ON. Workshop2018 - “Watercolour Painting”. Belmont House, Toronto, ON. Workshop

2018 - “Stitching for Beginners”. Voice Integrative School, Toronto, ON. Workshop

2018 - “Weaving Fever”. The Rekai Centres. Toronto, ON. Workshop

2017 - “Knitting for Beginners”. Newcomer Women Toronto, Toronto, ON. Workshop

2017 - “Knitting 101”. The Gladstone Hotel, Toronto, ON. Workshop

AWARDS 

2022 - Research and Creation Grant. Canada Council for the Art 

2021 - Visual Artists Creation Projects Grant. Ontario Arts Council

2021 - Professional Development Grant. Canada Council for the Arts

FEATURED IN (see gallery below)

2023 - New York Spring: Fair Director's Picks. Affordable Art Fair NY, New York

2021 - TOAF60 Juror's Pick. Toronto Outdoor Art Fair, Online Exhibition

Danielle Krysa, “Art Delivery: 08.21.21.”, Society Member in the Spotlight. The No Such Thing As Too Much Art Society, August 21, 2021. Online Newsletter.

Anahita Azrahimi, "Introducing the 2021 Artists", Juror’s Picks Review. Toronto Outdoor Art Fair, May 19, 2021. Online Newsletter.

"Fibre", MAAD Thesis Catalogue Jewelry + Fibre. 2016. Page 20. Print.

ARTIST RESIDENCY 

2021 - Alone Together Residency, New Brunswick College of Craft and Design


Featured in Gallery

A special thank you and acknowledgement to the funding support I have received from the 

Ontario Arts Council and the Canada Council for the Arts

©  2022 Michelle Marin 

Made with Pixpa
Share
http://www.michellemarin.ca/cv1 Copied